پروژههاي جاري پارسيان ريل
رديف | كارفرما | نام پروژه | مشخصه فني | درصد پيشرفت |
---|---|---|---|---|
1 | (Tehran Urban) | Line 3 will be a 36km long route starting from south-west in Islamshahr to Lashgarak in the north-east. It will have 23 underground and eight at-grade stations. It will pass through Chahardangeh, Rah-Ahan, Monirieh, Vali-e Asr squares, Shahid Beheshti Stree, Resalat, Majidieh streets and Imam Ali-Shahid Zeinuddin Intersection. توضيحات بيشتر | Power Supply of Line 3:
|
78%
|
2 | (Tehran Urban) | Line 4 is 20km long with 21 underground and one elevated stations. The first 2.5km section from Darvazeh Shemiran to Ferdowsi Square opened in March 2007. It was further extended to Shohada Square and Engelab Square in 2009. Shahid Kolahdouz station is the latest to be added on this line in 2010.
Mehrabad Air plant is new line added in 2016 توضيحات بيشتر |
Power Supply and SCADA of Line 4
|
94%
|
3 | (Shiraz Urban) | Line 2;The 15-kilometre (9.3 mi) ,It is currently under construction and will intersect with Line 1 at Imam Hossein Sq. It will run to Mian Rood and Aadel Abad via Enghelab Street and Basij Square. | Power Supply of SSS phase 2 and UPS
|
35%
|