1 |
(Tehran Urban) |
Line 3 will be a 36km long route starting from south-west in Islamshahr to Lashgarak in the north-east. It will have 23 underground and eight at-grade stations. It will pass through Chahardangeh, Rah-Ahan, Monirieh, Vali-e Asr squares, Shahid Beheshti Stree, Resalat, Majidieh streets and Imam Ali-Shahid Zeinuddin Intersection. |
Power Supply of Line 3:
- Extension of HVS 63/20kV Abas Abad
- Extension of HVS 63/20 Amir Kabir
- RS (750 VDC Rectifier Substation)
- LPS(20/0.4 kV Lighting and Power Substation)
- 63 kV cable network
- 20 kV cable network
- Third rail
|
78%
|
2 |
(Tehran Urban) |
Line 4 is 20km long with 21 underground and one elevated stations. The first 2.5km section from Darvazeh Shemiran to Ferdowsi Square opened in March 2007. It was further extended to Shohada Square and Engelab Square in 2009. Shahid Kolahdouz station is the latest to be added on this line in 2010.
Mehrabad Air plant is new line added in 2016
|
Power Supply and SCADA of Line 4
- HVS 63/20kV Ekbatan
- Extension of HVS 63/20kV Azadi
- RS (750 VDC Rectifier Substation)
- LPS(20/0.4 kV Lighting and Power Substation)
- 63 kV cable network
- 20 kV cable network
- Third rail
- SCADA
|
94%
|
3 |
(Shiraz Urban) |
Line 2;The 15-kilometre (9.3 mi) ,It is currently under construction and will intersect with Line 1 at Imam Hossein Sq.
It will run to Mian Rood and Aadel Abad via Enghelab Street and Basij Square.
|
Power Supply of SSS phase 2 and UPS
- 14 Station LPS(20/0.4 kV Lighting and Power Substation)
- Engineering and Procurement 50 unit UPS 40 KVA for all Line 2 station
|
35%
|